Part one-pulling half of the flats to the ramp out of the Strates yard. It usually takes four to six hours to assemble this train based on the numerous switching & wye moves. |
Date:
5/31/2007 |
Location:
Taft, FL |
Views:
611 |
Collection Of:
Kevin Andrusia |
Locomotives: |
Author: Kevin Andrusia
|
|
Picture Categories: |
This picture is part of album: Florida Color 2007 |