The DPUs from both trains meet just north of the Ark 12 overpass. The empty trains a lot of times get only one unit, and sometimes dont get any, with all the power up front. The current practice on loaded trains is to run them 2x3 on the Heavener Sub, so we have a pair of KCS units tacked on behind the BNSF DPU that came from Wyoming. |